[vc_row][vc_column][vc_column_text]This decarbonisation project involved the refurbishment of an energy centre in London, aiming to accelerate the transition to a low-carbon energy system. The project incorporated air source heat pumps (ASHPs), thermal storage systems, and solar photovoltaic (PV) panels, while replacing the existing boilers, pumps, BMS panels, and associated pipework with more efficient systems to improve overall energy performance and sustainability.
Deliverables required:
- Fully coordinated MEP drawings
- BIM
Project Information:
- Date: October 2024
- Project Type: Energy Centre
[/vc_column_text][/vc_column][/vc_row]